Correct construction sequence of cathode carbon block, refractory brick and refractory castable for aluminium reduction cell

Aluminum electrolysis cell is the main thermal equipment in aluminium electrolysis production. There are many electrolytic cells in the aluminium electrolysis workshop. The construction of furnace construction is often carried out in parallel or cross with other professional projects. In order to gain time to speed up the progress of the project and to centralize and timely supply of various materials and energy, several electrolyzers are usually constructed at the same time. Each electrolyzer has many construction processes, and the links between them are close. Construction and preparation of carbon materials need to ensure a certain humidity, but also consume a large amount of compressed air and electricity. Therefore, the preparation work of material transportation, compressed air and electricity supply should be done well before construction.


Construction of Aluminum Electrolytic Cell

The construction of electrolyzer should start from one end of the workshop and organize the flow-line operation according to the construction process of each electrolyzer. Before lining the electrolyzer, the production of cathode carbon block group should be carried out in advance. The construction of electrolyzer and the production of cathode carbon block are carried out according to the following procedures, as shown in Fig. 1 - 3.



Before the construction of the electrolyzer, the cathode carbon blocks and coarse seam paste are transported by car from the carbon material warehouse to the assembly yard of the electrolyzer overhaul workshop, then unloaded by forklift truck to the assembly platform and heated in the kneading pot. At the same time, after rust removal, the heated cathode steel rod is hoisted to the assembly platform by a bridge crane. The qualified cathode carbon block group is repaired and inspected. It is transported to the electrolysis cell of the electrolysis workshop by automobile. It is installed by bridge crane and hoisting frame. Clay refractory bricks, heat insulation products and side carbon block are transported to the open space of the electrolysis workshop by automobile, and then stacked on the operating platform near each electrolysis cell by bridge crane. The heated rough seam paste is put into the paste box and pulled to the electrolysis workshop by car for reserve.

Before tamping, the vertical seam between the bottom carbon block group and the seam between the carbon block group and the side carbon block can be put into the seam by 4-5kW tubular or chip heater to heat it to the required temperature. If the local temperature is not enough after heating, the light oil heater can be used for local heating.

After the anode carbon block group is manufactured in the anode assembly workshop, it is transported to the electrolysis workshop by an anode tray truck and installed by a multi-energy bridge crane. Other auxiliary materials and powder can be transported by trolley.


豫公網(wǎng)安備41058102000350號

Message
Contact
Scan

Scan

Top
gv天堂gv无码男同在线观看 | www.伊人网| 毛片视频免费网站 | 无套内射无矿码免费看黄 | 女人国产香蕉久久精品 | 1769视频在线| 欧美日韩亚洲国产精品 | 成在人av抽搐高潮喷水流白浆 | 摸进她的内裤里疯狂揉她动视频 | 亚洲国产成人一区二区精品区 | 精品人妻大屁股白浆无码 | 精彩视频一区二区 | 日韩人妻无码精品久久 | 国产成人福利免费观看 | 亚洲综合久久精品无码色欲 | 亚洲中文字幕无码爆乳av | 欧美成人形色生活片 | 久久久久久久久久福利 | 妺妺窝人体色www看人体 | 人妻熟女欲求不满在线 | 色综合av综合无码综合网站 | 欧美xxxxx高潮喷水麻豆 | 国产在线高清视频 | 一区二区三区内射美女毛片 | 国亚洲欧美日韩精品 | 欧美激情乱人伦 | 亚洲一区 日韩精品 中文字幕 | 欧美日韩精品一区二区三区不卡 | 国内精品久久久久久久影视 | a级毛片内射免费视频 | 成人无码α片在线观看不卡 | 老司机深夜福利视频 | 久久久国产精品免费视频 | 国产一在线精品一区在线观看 | 人妻 色综合网站 | 精品视频一区二区三区在线观看 | 国产在线视频区 | 久久99毛片免费观看不卡 | 被灌满精子的波多野结衣 | 天天摸夜夜摸摸到高潮 | 国色天香中文字幕在线视频 |